Saturday, September 13, 2008

As promised...

Back of the Central Park HoodieLeft front...
Moving right along on the right front section. Will block and sew shoulders together next. Then on to the hoodie part.

Friday, September 12, 2008

I HAVE been knitting!

It's been a while since I posted ... but that's because my camera quit cooperating with the computer. It wouldn't upload any pictures. So this afternoon I uninstalled all the software and reinstalled. Took an hour, but it was worth it. Here is what I have finished since the last post. Two Ballband dishcloths using leftover Sugar 'n Creme and Peaches & Cream cotton yarns.Nanners socks using 2.0mm 2 socks on 2 circular needles with Lorna's Laces Shepherd Socks Valentine colorway.
Schoolhouse dishcloth using 3.5mm circular needle and Peaches & Cream brick red cotton yarn.

Got back to work on my Central Park Hoodie Sweater. I have now finished 2 sleeves, and the back up to the neck which is on a stitchholder. Now working on the left front, at the armhole at this posting. I will upload current pictures of that tomorrow.